CHECKING AVAILABILITYLoading current availability…Loading availability

Loading
vygoai
Readiness Check

Operators

Campaign workspace

Run marketing and product campaigns end-to-end — create briefs, assign owners, track launch readiness across drafting, review, and launch, work a coherent queue, and publish milestone and weekly evidence.

Folder: vygoRepo: southu/vygo

Campaign briefs

Each brief captures the objective, audience, channels, and success metric. Open one to edit its brief and work its tasks.

Review stage

Readiness Check launch

Objective
Drive qualified sign-ups to the AI Readiness Check from founder-led channels.
Audience
Seed / Series A founders evaluating an AI build partner.
Channels
Email, LinkedIn, Website
Success metric
150 completed readiness checks in the first two weeks.
Owner: Harper Jones2 tasks
Edit brief & view tasks →

Drafting stage

Vibe-coding content series

Objective
Publish the vibe-coding guide series and convert readers to the waitlist.
Audience
Technical founders and operators shipping with AI agents.
Channels
Blog, Newsletter, Social
Success metric
8% waitlist conversion from series readers.
Owner: Dana Okafor2 tasks
Edit brief & view tasks →

Launch stage

Founding team hiring push

Objective
Fill two founding engineer roles from the careers page and referrals.
Audience
Senior engineers who want early ownership and real scope.
Channels
Careers page, Referrals, LinkedIn
Success metric
12 qualified applications and 2 signed offers.
Owner: Sam Rivera1 tasks
Edit brief & view tasks →

Launch readiness

Work flows through three stages. Each has explicit acceptance checks that must pass before a task advances.

1. Drafting

2

Shape the brief, the offer, and the assets. Get to a reviewable first cut.

Acceptance checks

  • Brief objective, audience, and primary channel are written down
  • Draft copy and hero asset exist and are linked
  • Owner assigned and target launch date set

In this stage

2. Review

2

Pressure-test claims, compliance, and tracking before anything ships.

Acceptance checks

  • Copy reviewed for claims and brand voice
  • Analytics events and UTM tags defined and verified
  • Legal/privacy sign-off recorded where required

In this stage

3. Launch

1

Ship, watch the first signals, and capture evidence of the outcome.

Acceptance checks

  • Assets published to the live channel and reachable
  • Post-launch metrics wired to the dashboard
  • Milestone evidence captured within 48 hours

In this stage

Campaign queue

A single ordered work list. Run it top to bottom — every item shows its owner, stage, acceptance checks, milestone evidence, and the vygo folder / southu/vygo repository it belongs to.

  1. 1

    Finalize Readiness Check launch brief

    Readiness Check launch · Drafting stage

    Done

    Lock objective, audience, and the ten-minute promise before review.

    Owner
    Harper Jones· Campaign lead
    Stage
    Drafting

    Acceptance checks

    • Objective, audience, and channel written down
    • Draft hero copy linked
    • Owner and launch date set

    Milestone evidence · Brief signed off

    Brief approved 2026-07-21; hero copy + audience locked in the shared doc.

    Folder: vygoRepo: southu/vygo
  2. 2

    Verify analytics + UTM tracking for Readiness Check

    Readiness Check launch · Review stage

    In progress

    Confirm every CTA fires the right event and carries a UTM before launch.

    Owner
    Priya Nair· Growth analyst
    Stage
    Review

    Acceptance checks

    • Copy reviewed for claims and voice
    • Analytics events + UTM tags verified
    • Privacy sign-off recorded

    Milestone evidence · Tracking verified

    3 of 5 CTAs confirmed firing readiness_check_start; 2 pending QA on staging.

    Folder: vygoRepo: southu/vygo
  3. 3

    Draft vibe-coding series part 2

    Vibe-coding content series · Drafting stage

    In progress

    Write the second installment and its newsletter teaser.

    Owner
    Dana Okafor· Content lead
    Stage
    Drafting

    Acceptance checks

    • Outline approved
    • Draft body written
    • Newsletter teaser drafted

    Milestone evidence · Part 2 draft ready

    Outline approved 2026-07-24; 900 of ~1,600 words drafted.

    Folder: vygoRepo: southu/vygo
  4. 4

    Review vibe-coding claims + privacy audit

    Vibe-coding content series · Review stage

    To do

    Run the privacy audit and claims review on the series before publish.

    Owner
    Marcus Lee· Editorial reviewer
    Stage
    Review

    Acceptance checks

    • Claims reviewed against product reality
    • Privacy audit completed
    • Links and citations checked

    Milestone evidence · Series cleared for publish

    Pending — privacy audit scheduled for the week of 2026-08-03.

    Folder: vygoRepo: southu/vygo
  5. 5

    Launch founding-engineer roles

    Founding team hiring push · Launch stage

    In progress

    Publish both roles, wire application tracking, and open referrals.

    Owner
    Sam Rivera· Talent lead
    Stage
    Launch

    Acceptance checks

    • Roles published and reachable
    • Application analytics wired to dashboard
    • Milestone evidence captured

    Milestone evidence · Roles live and tracked

    Both roles live on /careers since 2026-07-27; 4 applications captured so far.

    Folder: vygoRepo: southu/vygo

Weekly evidence summary

Concise, published evidence of what shipped each week across every campaign.

Week of 2026-07-27

Tasks completed: 3Applications captured: 4CTAs verified: 3 / 5

Careers roles live; Readiness Check tracking in final QA.

  • Founding-engineer roles launched on /careers with application analytics wired.
  • Readiness Check tracking review reached 3 of 5 CTAs verified.
  • Vibe-coding series part 2 crossed the halfway mark in drafting.

Week of 2026-07-20

Tasks completed: 2Briefs signed off: 1Stages advanced: 2

Readiness Check brief signed off and moved into review.

  • Readiness Check launch brief approved and locked.
  • Analytics event catalog drafted for all launch CTAs.
  • Careers roles entered launch prep.