CHECKING AVAILABILITYLoading current availability…Loading availability

Loading
vygoai
Readiness Check

Method

A fixed methodology, not open-ended consulting.

The validated product remains visible throughout the rebuild. Customers of VYGO receive weekly demos and staging access rather than waiting months for a reveal.

Cutover is planned with rollback procedures. Zero-downtime migration is not promised in all cases unless specifically guaranteed for the engagement.

Start with the audit
1

Audit

Weeks 1–2

Establish a defensible view of risk, keep-versus-rebuild scope, and fixed-price path.

Activities

  • Codebase and architecture review
  • Security and data access assessment
  • Operational readiness inspection
  • Findings report and fixed-price plan

Customer involvement

Provide access, context, and commercial constraints; review interim findings.

Deliverables

  • Findings report
  • Keep-versus-rebuild map
  • Fixed-price proposal

Typical risks

  • Incomplete access slows assessment
  • Hidden production dependencies

Decision gate

Customer accepts, revises, or declines the rebuild plan.

2

Architect

Weeks 2–4

Define the target platform without erasing validated product behavior.

Activities

  • Target architecture and data model
  • Environment and delivery pipeline design
  • Security boundaries and compliance-readiness roadmap

Customer involvement

Validate product behavior priorities and environment constraints.

Deliverables

  • Architecture blueprint
  • Environment plan
  • Security and compliance-readiness roadmap

Typical risks

  • Unresolved product edge cases
  • Third-party constraints

Decision gate

Architecture and delivery plan approved before rebuild acceleration.

3

Rebuild

Weeks 4–10

Re-engineer core services while preserving validated UX and workflows.

Activities

  • Service and API re-engineering
  • Data migration planning and execution
  • Weekly demos and staging access

Customer involvement

Review demos, prioritize product behavior, and validate migrations.

Deliverables

  • Rebuilt services
  • Migrated data paths
  • Staging product visibility

Typical risks

  • Data edge cases
  • Scope pressure from new feature requests

Decision gate

Staging product matches agreed behavior for launch candidates.

4

Quality assurance & UAT, built into every build

Throughout the build

Every engagement includes a dedicated QA resource from day one, so quality is engineered in throughout the build instead of inspected at the end.

Activities

  • Test plans are written against validated requirements.
  • Automated and manual testing runs throughout the build.
  • Structured UAT happens before launch.

Customer involvement

Confirm acceptance criteria against requirements, review test evidence, and take part in structured UAT before launch.

Deliverables

  • Requirement-linked test plans
  • Automated and manual test suites with results
  • Signed-off UAT and release readiness

Typical risks

  • Requirements that shift after test plans are agreed
  • Limited customer availability for UAT

Decision gate

Nothing goes live without independent QA sign-off — not just developer-tested code.

5

Harden

Weeks 8–12

Prove the platform can survive real load, failure, and operational use.

Activities

  • Security, load, failure, backup, and recovery testing
  • Observability and alerting
  • Operational control implementation

Customer involvement

Review risk findings and accept residual-risk decisions.

Deliverables

  • Test evidence
  • Alerting and runbooks
  • Hardened environments

Typical risks

  • Late-discovered load issues
  • Incomplete operational ownership

Decision gate

Launch readiness criteria met for the contracted tier.

6

Certify-ready

Weeks 10–16

Prepare evidence and operating practices for independent audit processes.

Activities

  • Policies and evidence workflows
  • Audit process support
  • Third-party testing coordination where required

Customer involvement

Provide business policy inputs and auditor access as needed.

Deliverables

  • Evidence program
  • Policy package
  • Audit support artifacts

Typical risks

  • Auditor timelines outside engineering control

Decision gate

Readiness package complete for the contracted compliance path.

7

Operate

Ongoing

Keep the platform secure, observable, and moving—with compliance-readiness upkeep through vygo Ops.

Activities

  • vygo Ops monitoring and response
  • Security and compliance-readiness upkeep
  • Continued feature engineering when contracted

Customer involvement

Product prioritization and operational decision rights remain with the customer.

Deliverables

  • Operational ownership
  • Documented handoff-ready system

Typical risks

  • Unowned production decisions after launch

Decision gate

Customer may continue Ops with VYGO, or transfer to another qualified team.

What changes by tier

Production infrastructure & CI/CD

Launch
Included
Scale
Included
Enterprise
Included + higher availability design

Identity (RBAC / SSO readiness)

Launch
Auth foundation
Scale
RBAC + SSO-ready
Enterprise
Enterprise SSO/SAML + tenant model

Penetration testing

Launch
Not default
Scale
Third-party coordination
Enterprise
Third-party coordination + remediation depth

Compliance path

Launch
Baseline controls
Scale
SOC 2 Type I readiness
Enterprise
Type II program + ISO 27001 pathway

Ops continuity

Launch
Optional
Scale
Recommended
Enterprise
Recommended with dedicated pod options